Chamberlain 248739 User Manual Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 44
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
13
INSTALLATION STEP 2
Install the Header Bracket
You can attach the header bracket either to the wall above
the garage door, or to the ceiling. Follow the instructions
which will work best for your particular requirements.
Do not install the header bracket over drywall. If
installing into masonry, use concrete
anchors (not provided).
WALL HEADER BRACKET INSTALLATION
Center the bracket on the vertical centerline with the
bottom edge of the bracket on the horizontal line as
shown (with the arrow pointing toward the ceiling).
Mark the vertical set of bracket holes. Drill 3/16" pilot
holes and fasten the bracket securely to a structural
support with the hardware provided.
HARDWARE SHOWN ACTUAL SIZE
CEILING HEADER BRACKET INSTALLATION
Extend the vertical centerline onto the ceiling as shown.
Center the bracket on the vertical mark, no more than
6" (15 cm) from the wall. Make sure the arrow is
pointing away from the wall. The bracket can be
mounted fl ush against the ceiling when clearance
is minimal.
Mark the side holes. Drill 3/16" pilot holes and fasten
bracket securely to a structural support with the
hardware provided.
Lag Screw
5/16"-9x1-5/8"
Vertical
Centerline
of Garage
Door
Vertical
Centerline
of Garage Door
Optional
Mounting Holes
Lag Screws
5/16"-9x1-5/8"
2x4
Structural
Support
Horizontal
Line
Wall Mount
Header
Bracket
Door Spring
Highest Point of
Garage Door Travel
Garage Door
Header Wall
Vertical Centerline
of Garage Door
Vertical
Centerline
of Garage Door
Garage Door
Lag Screws
5/16"-9x1-5/8"
Ceiling Mounting Holes
Header
Bracket
Door
Spring
6" (15 cm) Maximum
Header Wall
Finished Ceiling
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 43 44

Comments to this Manuals

No comments