11
Installation
STEP 1 Determine the header bracket location
To prevent possible SERIOUS INJURY or DEATH:
• Header bracket MUST be RIGIDLY fastened to structural supporton header wall or ceiling,
otherwise garage door might NOT reverse when required. DO NOT install header bracket over
drywall.
• Concrete anchors MUSTbe used if mounting header bracket or 2x4 into masonry.
• NEVER try to loosen, move or adjustgarage door, springs, cables,pulleys, brackets,or their
hardware, ALL of which are under EXTREME tension.
• ALWAYS call a trained door systemstechnician if garage door binds,sticks,or is out of balance.
An unbalanced garage door might NOT reverse when required.
Installation procedures vary according to garage door types.Follow the instructions which apply to your
door.
1. Close the door and mark the inside vertical centerline of the garage door.
2. Extend the line onto the header wall above the door.
You can fasten the header bracket within 4 feet (1.22 m) of the left or right of the door
center only if a torsion spring orcenter bearing plate is in the way; or you can attach it to
the ceiling when clearance is minimal. (It may be mounted on the wall upside down if
necessary, to gain approximately 1/2" (1 cm).
If you need to install the header bracket on a 2x4 (on wall or ceiling), use lag screws(not
provided) to securely fasten the 2x4 to structural supports.
3. Open your door to the highestpoint of travel as shown. Draw an intersecting horizontal line on
the header wall 2" (5 cm) above the high point :
l
2" (5 cm) above the high point for sectional door and one-piece door with track.
l
8" (20 cm) above the high point for one-piece door without track.
This height will provide travel clearance for the top edge of the door. NOTE:If the total number of inches
exceeds the height available in your garage, use the maximum height possible, or refer to page 12 for
ceiling installation.
Header Wall
Vertical Centerline of Garage Door
2x4
Structural
Supports
Level
(Optional)
Unfinished
Ceiling
2x4
OPTIONAL CEILING MOUNT
FOR HEADER BRACKET
Sectional door with curved track
Header Wall
Track
2" (5 cm)
Highest Point
of Travel
Door
One-piece door with horizontal track
Header Wall
Track
2" (5 cm)
Highest
Point
of Travel
Door
One-piece door without track:
jamb hardware
Header
Wall
8" (20 cm)
Highest
Point of
Travel
Door
Jamb
Hardware
One-piece door without track:
pivot hardware
Header Wall
8" (20 cm)
Highest
Point of
Travel
Door
Pivot
Comments to this Manuals